Overseas Projects

Date: 2025-4-20  17:27:50

Recently, China's first large-scale new energy system built at the Qinling Station in Antarctica was officially put into use, marking a breakthrough in China's polar scientific research and officially entering the era of green energy.

Material: AL6061-T6

Design: Fixed method for backfill soil foundation, the bottom of the bracket adopts a lattice structure.

The components are fixed with pressure strips, and a baffle is set at the bottom of the track to withstand high-intensity wind and heavy snow pressure.

1-250403150T4419.png1-250403150UW38.png

1-250403151003103.png

CATEGORIES

CONTACT US

Contact: Ms. Aurora He

Phone: +86 18896537819

Tel: 86-512-66232972

Email: sales@cn-futuro.com

Add: No.1018, QinfengRoad,Jiangyin City, Jiangsu, China, 214425